It took 4 days but the hole was finally completed on Friday. All next week should be fantastic weather but you never know. The footings are scheduled to be poured tomorrow. If all goes well, our basement will be done by the end of this week.
Also up this week: meetings with Chris from City View Hardwood for our floors and with Matt from Rosenlof-Lucas for potential landscape design.
Posted by Alyssa at 11:32 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

My photo
Alyssa
Minneapolis, MN, United States
View my complete profile

Links

  • Phillips Garden
  • Columbia Park Neighborhood Link
  • MN GreenStar
  • 100K House
  • Metrohippie Blog
  • Natural Built Home
  • Summit Design-Build
  • Plyboo
  • Kirei board
  • 5040 George Kovacs Bath Light
  • Model 912 PLC Bath Light
  • Modern Doorbells
  • George Kovacs Bath Light
  • Progress Lighting - Outdoor Light Selection
  • ma architecture
  • Hive Modular
  • Livemodern

Blog Archive

  • ▼  2008 (56)
    • ►  September (3)
    • ►  August (5)
    • ►  July (12)
    • ▼  June (16)
      • Today's progress...
      • Still Framing....
      • We Have Walls!
      • Backfilled today
      • Progress in the Hole
      • Flooring....
      • Basement Wall Forms
      • Final and Full Permit Approved Today!
      • Footings Poured
      • Big Dig Complete
      • The Big Dig Wasn't So Big After All...
      • Plumbing Fixtures
      • Low Flow Options for Water Conservation
      • Photos from the Big Dig
      • MN GreenStar
      • The Big Dig
    • ►  May (13)
    • ►  April (2)
    • ►  March (5)
  • ►  2007 (1)
    • ►  November (1)